Field Change Order: 2020 Date of Issue : 28th August 1990 Applicable to : FileStore E01 Reason for Issue: Design error: Bi-phase network clock is 180 degrees out of phase with clocks generated by Econet Clock Boxes and E01S FileStores. Consequently the system fails to recognise the presence of an external clock (when these are installed in larger networks). This can cause unreliable network data transfer. Types Affected: All Product. M Series (AEH26 - 0354,002) C Series (AFH26 - 0354,000) Description of Change: On COMPONENT side of PCB: Cut 2 tracks - IC26 pin 14 to SK10 pin4 IC26 pin 15 to SK10 pin 5 On SOLDER side of PCB : link as follows - IC26 pin 14 to SK10 pin 5 IC26 pin 15 to SK10 pin4 Claim Procedure: Following completion of the field change order instructions, service engineers should fill out a service report clearly stating the serial no. of the host unit, the FCO no. (above), and claim the FCO credit rate (below) for labour charges. Any replaced components should be wrapped to ensure safe carriage and returned with the service report. Acorn will verify the information and, process the claim for labour charges and issue any replacement components as necessary. Rework Doc. Reference: FCO 2020 Credit Rate: £16.00 (Sixteen) Special Instructions: